| Brand: | NULL | Material: | Metal |
|---|---|---|---|
| Feature: | GPS Navigation, Auto Focus, 4g, Build In Flash, APP Control, IP67 Waterproof, Kids, FOR PETS, For Elderly, For Loneworker, For Patients | Function: | Lighting, Remote Control, App Remote Control, GPS Location, Power Saving Mode, Real Time Tracking, Geo Fence Alarm, Location History |
| Positioning Mode: | GPS, GLONASS, Beidou, Celluar tower, LBS, GSM, GPRS, AGPS, Other | Private Mold: | Yes |
| Battery: | Rechargeable Battery, 700mAh | Display Type: | OLED |
| Type: | GPS Tracker, Gps Locator | Operating System: | Android, IOS, Windows |
| Function: | Real-time Tracking | Network: | 2G And 4G Cat1 Networks |
| Product Name: | Pet Gps Tracker | Waterproof: | IP67, Ip67 |
| SIM Card Type: | Nano Sim Card | Use: | Pet/animal |
| Sitemap